Grand Junction High School - Grand Junction, CO

Grand Junction HS
Project Details

Client:

Size:

Mesa County Valley District 51

240,000 SF

In conjunction with DLR Group, the BG team is working closely with the School District and its campaign team members to present a design concept for a Grand Junction High School. Currently at 50+ years old and in deep need of replacement, it is due time for our community to receive an upgraded environment for our youth.

 

The project will be entered as a 2021 Bond measure for community voting. 

Services Provided

Architecture

Interior Design

Montrose PSC

Montrose Public Safety Complex - Montrose, CO

Project Details

Client:

Size:

City of Montrose

37,000 SF

Services Provided

Architecture

Interior Design

FF&E

Construction Administration

The new Montrose Public Safety Complex will provide much needed space for the police and public safety teams of Montrose. Located near the main corridor of Montrose, this new complex is design to fit into the downtown context, provide much needed police and support services, and boasts a curtain-wall community room for use by community members. 

General Contractor: Shaw Construction

Owner's Representative: Dynamic Program Management

Design Architect: McClaren, Wilson, & Lawrie

Construction timeline: May 2021 through late summer 2022

Rivertown Medical Office Building - Grand Junction, CO

Rivertown MOB
Project Details

Client:

 

 

Size:

Budget:

S.U.R.E.

Straight Up Real Estate

21,300 SF

$3.3M

Services Provided

Architecture

Construction Administration

The new Rivertown Center Medical Office Building Shell will consist of an exterior shell with interior tenant improvements to be completed at a future date by the tenant’s chosen design team. Located on Patterson Road, the medical office building is to be the first structure of a larger endeavor to modernize the concept of mixed-use retail structures into a walk-able campus style development. 

 

The new building will be located on the north west corner of a larger development and will consist of approximately 21,300 square feet on one story.

 

General Contractor: PNCI

Construction timeline: Begun mid-summer of 2020. 

 

GJFS3

Grand Junction Fire Station 3 - Grand Junction, CO

Project Details

Client:

Size:

Budget:

City of Grand Junction

10,500 SF

$4.5M

A much needed replacement of Grand Junction Fire Station 3, located at Patterson Rd and 25 1/2 Rd.

GJ Sentinel Article

General Contractor: FCI Constructors, Inc.

Construction timeline: End of summer 2021 through summer 2022.

Services Provided

Architecture

Interior Design

Construction Administration

Independence Academy Charter School Addition - Grand Junction, CO 

Project Details
Services Provided

Independence Academy Charter School

18,000 SF

Client:

Size:

 

Architectural Services

Interior Design

Construction Administration

The first building of Independence Academy Charter School opened in 2015. With approximately 19,100 SF of space in the main building, along with a grouping of modular classrooms to round out the school’s needs at the time.

 

The current addition is just under 18,000 SF and is planned to add enough space for the school to have two classrooms at each grade level from pre-kindergarten through fifth grade. In addition to the elementary classrooms, the addition will house a music classroom and a large art classroom. The configuration of this addition will permit another future addition or two to be constructed in the future. 

General Contractor: Asset Engineering

Owner's Representative: Rob Jenkins

Construction timeline: May 2020 through July 2021

Project Details
Services Provided

Architecture

Interior Design

Project Management

Town of Crested Butte

Client:

 

 

The town of Crested Butte is beginning the process of designing a new Fire Station and support services building for their essential teams.

The project will be entered as a 2021 Bond measure for community voting. 

Contractor: FCI Constructors, Inc.

Owner's Representative: Goulding Development Advisors

Design Architect: TCA Architecture Planning

Home Loan State Bank - Montrose Branch - Montrose, CO

Project Details
Services Provided

Home Loan State Bank

15,000 SF

Client:

 

Size:

 

 

Architecture

Interior Design

New branch along Townsend Avenue for Home Loan State Bank. This two story building will be clad in masonry, stucco, and metal panels, and provide tenant space on the north side of the building. 

Project Details
Services Provided

Architecture

Interior Design

Networks Unlimited

16,000 SF

Client:

Size:

 

 

Located on the southeast side of downtown, Networks Unlimited is renovating and existing building to create their new industrial-look office space! ​

General Contractor: Dare-Case Contracting Services

Other Current Projects

Cactus Valley Elementary School Slab Repair - Silt, CO

Rocky Mountain Elementary School Amphitheater - Clifton, CO

Mesa Valley Community School Renovation - Grand Junction, CO

Coffee Trader Tenant Finish at Rivertown Center - Grand Junction, CO

Cedaredge High School Gymnasium Addition - Cedaredge, CO

Collbran Congregational Church ADA Renovation - Collbran, CO

Grand Junction Airport Interior Renovation - Grand Junction, CO

517 North First - Grand Junction, CO

Family Health West Orthopedics - Grand Junction, CO

Delta County Courthouse Renovations - Delta, CO

Grand Junction Police Department Renovations - Grand Junction, CO

IACS Addition
CBFPD
Other Current Projects
Networks Unlimited
Montrose Home Loan

Crested Butte Fire Protection District - Crested Butte, CO

Networks Unlimited  - Grand Junction, CO