
Heading 6
CURRENT PROJECTS
Grand Junction High School - Grand Junction, CO
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
Project Details
Client:
​
​
Size:
Mesa County Valley District 51
​
240,000 SF
​
​
​
In conjunction with DLR Group, the BG team is working closely with the School District and its campaign team members to present a design concept for a Grand Junction High School. Currently at 50+ years old and in deep need of replacement, it is due time for our community to receive an upgraded environment for our youth.
The project will be entered as a 2021 Bond measure for community voting.
​
Services Provided
Architecture
Interior Design
​

Montrose Public Safety Complex - Montrose, CO
![]() | ![]() | ![]() |
---|
Project Details
Client:
​
Size:
City of Montrose
​
37,000 SF
​
​
​
Services Provided
Architecture
Interior Design
FF&E
Construction Administration
​
The new Montrose Public Safety Complex will provide much needed space for the police and public safety teams of Montrose. Located near the main corridor of Montrose, this new complex is design to fit into the downtown context, provide much needed police and support services, and boasts a curtain-wall community room for use by community members.
​
General Contractor: Shaw Construction
Owner's Representative: Dynamic Program Management
Design Architect: McClaren, Wilson, & Lawrie
​
Construction timeline: May 2021 through late summer 2022

Rivertown Medical Office Building - Grand Junction, CO
![]() | ![]() | ![]() |
---|---|---|
![]() |
Project Details
Client:
Size:
​
Budget:
S.U.R.E.
Straight Up Real Estate
​
21,300 SF
​
$3.3M
​
​
​
​
Services Provided
Architecture
Construction Administration
The new Rivertown Center Medical Office Building Shell will consist of an exterior shell with interior tenant improvements to be completed at a future date by the tenant’s chosen design team. Located on Patterson Road, the medical office building is to be the first structure of a larger endeavor to modernize the concept of mixed-use retail structures into a walk-able campus style development.
The new building will be located on the north west corner of a larger development and will consist of approximately 21,300 square feet on one story.
General Contractor: PNCI
​
Construction timeline: Begun mid-summer of 2020.
​

Grand Junction Fire Station 3 - Grand Junction, CO
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
Project Details
Client:
​
Size:
​
Budget:
City of Grand Junction
​
10,500 SF
​
​
$4.5M
​
A much needed replacement of Grand Junction Fire Station 3, located at Patterson Rd and 25 1/2 Rd.
​
​
General Contractor: FCI Constructors, Inc.
​
Construction timeline: End of summer 2021 through summer 2022.
​
Services Provided
Architecture
Interior Design
Construction Administration
Independence Academy Charter School Addition - Grand Junction, CO
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() |
Project Details
Services Provided
Independence Academy Charter School
​
​
18,000 SF
Client:
​
​
Size:
​
Architectural Services
Interior Design
Construction Administration
The first building of Independence Academy Charter School opened in 2015. With approximately 19,100 SF of space in the main building, along with a grouping of modular classrooms to round out the school’s needs at the time.
The current addition is just under 18,000 SF and is planned to add enough space for the school to have two classrooms at each grade level from pre-kindergarten through fifth grade. In addition to the elementary classrooms, the addition will house a music classroom and a large art classroom. The configuration of this addition will permit another future addition or two to be constructed in the future.
​
General Contractor: Asset Engineering
Owner's Representative: Rob Jenkins
​
Construction timeline: May 2020 through July 2021
![]() | ![]() |
---|
Project Details
Services Provided
Architecture
Interior Design
Project Management
Town of Crested Butte
Client:
​
The town of Crested Butte is beginning the process of designing a new Fire Station and support services building for their essential teams.
​
The project will be entered as a 2021 Bond measure for community voting.
​
Contractor: FCI Constructors, Inc.
Owner's Representative: Goulding Development Advisors
Design Architect: TCA Architecture Planning
Home Loan State Bank - Montrose Branch - Montrose, CO

![]() |
---|
Project Details
Services Provided
Home Loan State Bank
​
15,000 SF
Client:
​
Size:
​
Architecture
Interior Design
New branch along Townsend Avenue for Home Loan State Bank. This two story building will be clad in masonry, stucco, and metal panels, and provide tenant space on the north side of the building.
![]() |
---|
Project Details
Services Provided
Architecture
Interior Design
Networks Unlimited
​
16,000 SF
Client:
​
Size:
​
Located on the southeast side of downtown, Networks Unlimited is renovating and existing building to create their new industrial-look office space! ​
​
General Contractor: Dare-Case Contracting Services

Other Current Projects
Cactus Valley Elementary School Slab Repair - Silt, CO
​
Rocky Mountain Elementary School Amphitheater - Clifton, CO
​
Mesa Valley Community School Renovation - Grand Junction, CO
​
Coffee Trader Tenant Finish at Rivertown Center - Grand Junction, CO
​
Cedaredge High School Gymnasium Addition - Cedaredge, CO
​
Collbran Congregational Church ADA Renovation - Collbran, CO
​
Grand Junction Airport Interior Renovation - Grand Junction, CO
​
517 North First - Grand Junction, CO
​
Family Health West Orthopedics - Grand Junction, CO
​
Delta County Courthouse Renovations - Delta, CO
​
Grand Junction Police Department Renovations - Grand Junction, CO
​


